Casasco
Project
Solid product plant
Client
Casasco
Place
Spain
Sector
Biofarmacéutico
Installed surface
3,500 m2
Casasco Laboratory
Solid production area composed of two execution stages. The first stage was carried out as a turnkey project, including the installation of ISO 8 HVAC systems and internal civil works.
About the project
Primary conditioning areas were executed, some of them with low humidity through silica gel dryers, as well as non-classified ISO 9 control areas, which included secondary conditioning, storage areas, and general and support areas (dining rooms, locker rooms, offices, circulation, etc.). The cold and hot water production was carried out using a 100% heat recovery unit with 750 kW; the hydraulic distribution of cold and hot water; and the supply of hot sanitary water through heat exchangers.
This project included the coordination and execution of the room enclosures; epoxy resin flooring; installation of the BMS systems; electrical installation with power panels for the chiller and air handler, lighting, and other elements, as well as the installation’s control system. Valtria completed the entire project.