CAPEX vs OPEX in GMP Facilities for Advanced Therapies
Design and installation of clean rooms, from concept to commissioning and certification. (ISO 14644, GMPs, Biosafety ASL 2 and 3, BSL 2 and 3).
Latest post_
Innovating excellence in cleanroom design and installation
Cleanroom engineering constantly pushes the limits of innovation, and at Valtria we offer cutting-edge solutions.
June 2023
Clean Rooms
The keys in the design, construction, and HVAC of cleanrooms in the Cosmetics Industry under current regulations.
We design, install and maintain clean rooms in the cosmetics industry.
June 2023
Clean Rooms
Design and installation of clean rooms and critical areas for the food sector
Clean rooms and critical areas are essential in the food industry to ensure the safety and quality of food products.
April 2023
Clean Rooms
Cleanroom requirements for the manufacture of lithium-ion batteries for the automotive industry
Lithium-ion batteries have become the leading technology for powering electric vehicles in the automotive industry.
April 2023
Clean Rooms
How to choose a suitable cleanroom
To choose a suitable cleanroom it is necessary to know the operational needs of the business and its standards
April 2023
Clean Rooms
Energy efficiency in the cultivation and processing of medical cannabis
An efficient design of the facility will increase the direct profitability of the farm and reduce the carbon footprint, providing added value for these products of plant origin.
February 2023
Medicinal cannabis
Sunlight and Valtria cooperate on new manufacturing plant for power batteries in Greece
Sunlight has awarded us the contract for the design and installation of clean and dry room combined with HVAC solution for lithium-ion battery manufacturing.
February 2023
High technology
ISO 14644-16: Energy efficiency comes to clean rooms
The ISO 14644-16 is a really useful to rationalise and reduce energy consumption in cleanrooms.
February 2023
Clean Rooms
New drying tunnel for B.Braun for fast and efficient drying of infusion bottles
The comprehensive and modular concept of the new Valtria drying tunnel ensures maximum scalability, flexible adaptation and swift integration into customer-specific production processes.
January 2023
Pharma
VALTRIA Madrid moved office
We moved, find out where you can find us
January 2023
Valtria
VALTRIA Finland Oy – Overall supplier North Ostrobothnia hospital
We are happy to continue our fruitful cooperation with the North Ostrobothnia Hospital
January 2023
Clean Rooms