Roche
Project
HAPI Dispensing Area
Client
Roche
Place
Spain
Sector
Biopharmaceutical
Installed surface
300 m2
Roche
Turnkey project to expand and adjust the dosing zone for high active pharmaceutical ingredients (HAPI)
About the project
Valtria’s scope for this project included the execution of:
- the cleanroom walls and ceilings with a total area of 300 m2
- the air handling systems with ISO 8 and ISO 5 classifications, including LF units
- dust collection systems with high retention capacity
- the CIP system for cleaning the weighing isolator
- the installation of the electrical supply and automation of all equipment